Safe & Controlled Dismantling AMS13

The Netherlands Demolition Dismantling

Safe & Controlled Dismantling AMS13

DDM has been commissioned by Winthrop Technologies to carry out the dismantling of the former FedEx complex in Schiphol-Rijk to facilitate the development of the AMS13 data centre. The scope of work includes the complete demolition of the distribution warehouse, including its floor slab and foundations, the structural strip-out and demolition of the office building, and the removal of loading docks and external hardstanding areas.

The project was carried out by a team of experienced decommissioningspecialists, machine operators, and site supervisors. Throughout the entireproject duration, there were no health or safety incidents involving employees, subcontractors, or members of the public. 

The primary challenge was to execute the demolition and dismantling works without adversely affecting surrounding business operations and sensitive manufacturing processes. Vibrations had the potential to impact nearby buildings and technical installations. In addition, it was essential to ensure that employees, visitors, and local residents were not exposed to risks arising from the works. 

A second challenge was the safe execution of the dismantling activities within an environment where multiple disciplines were operating simultaneously. Effective communication, clearly defined working procedures, and continuous safety monitoring were therefore critical to the successful delivery of the project.

Scope of Work

  • Controlled demolition of the office building down to structural shell level (structural demolition).
  • Complete demolition of the warehouse structure, including foundations and ground floor slab.
  • Soft stripping and removal of non-structural building components from the office and warehouse.
  • Environmental controls including dust suppression, vibration management and pollution prevention.
  • Removal of loading docks, associated structures and hardstanding areas.
  • Segregation, handling and temporary storage of demolition materials and waste streams.
  • Safe management and coordination of demolition activities.
  • Loading, transport and disposal/recycling of demolition materials through approved waste contractors.
  • Site clearance, final grading and preparation of the area for the subsequent AMS13 data centre development.
  • Site surveys, inspections and verification of utility disconnections prior to demolition.
IMG_5131 IMG_5126 PHOTO-2025-10-16-18-24-01 IMG_9777

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
IMG_4384
Ecolab: Dismantling and transporting an iconic soap factory in Nieuwegein
NL Relocation Dismantling
PHOTO-2024-09-17-15-33-425
Controlled demolition in a live operational environment
DE Dismantling Demolition
IMG_2794
Efficient and safe dismantling of a power plant in Berlin
DE Demolition
batch_22-11-2021 (18) (1)
Complex dismantling of the arch bridge in Vianen
NL Dismantling
1758951108587
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2)
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens
DARDA C12
BE Demolition