 In 2024 was DDM commissioned by Ecolab to dismantle an iconic soap fac­tory in Nieuwegein. The factory extended across five floors and accommo­dated the entire production process, from the storage of raw materials to the packaging of the final product, all housed in stainless steel equipment. 

Many components, including storage tanks, mixing vessels, dosing tanks, packaging machines, and conveyor belts, were sold by Ecolab. Additionally, at the client’s request, DDM was responsible for offering several special­ized installations, such as large storage tanks, to its professional network. 

DDM also handled the relocation of an entire production line. The line was dismantled, prepared for transport using various custom-made support frames, and moved in ten trucks to a new site in France. Upon arrival, DDM reassembled the entire factory line. 

Working closely with Ecolab, DDM first conducted an inspection to identify any leftover product residue and ensure a safe environment during disman­tling and transport. 

All factory components, including vessels, mixers, and dosing devices, were carefully dismantled and prepared for transportation. In order to remove certain installations, temporary openings were created in the façades and floors on several levels of the building. 

For the approximately 500 installations and items, which included pumps, compressors, robots, packaging machines, and dosing mixers, appropriate transport methods were selected. Equipment parts such as screw convey­ors were secured to avoid damage, and special transport services were arranged for the largest objects. 

All equipment and installations were dismantled and transported without damage. Upon completion of the project, DDM restored the building to a safe condition by professionally sealing the temporary openings in the floors and façades.

IMG_4384 IMG_4289 IMG_2692

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
IMG_3383 (2)
Dismantling of the TDI – TDA installation at BASF
DE
IMG_5131
Safe & Controlled Dismantling AMS13
NL Dismantling Demolition
PHOTO-2024-09-17-15-33-425
Controlled demolition in a live operational environment
DE Dismantling Demolition
IMG_2794
Efficient and safe dismantling of a power plant in Berlin
DE Demolition
batch_22-11-2021 (18) (1)
Complex dismantling of the arch bridge in Vianen
NL Dismantling
1758951108587
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2)
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition