Turn around on an oil refinery in Greece

Athene, Greece Dismantling

Turn around on an oil refinery in Greece

Over the years, all production installations lose capacity, which is why these installations must be maintained periodically. In addition to maintenance on the installations, DDM also fully coordinates all contractors during these shut-downs. So that the installations can function optimally again afterwards. DDM carries out this work at several sites in different countries, this time in Greece.

“There were forty of us in total,” says site manager Dave Straker. “A strong and experienced team was present, they guided and managed the project. We worked hard 24 hours a day, 7 days a week, in shifts. Using various techniques and the associated tools, we were able to carry out the maintenance of the entire installation. A very precise and intensive work.

DDM has now built up a strong reputation in the field of turnaround and shutdowns. “We are proud that we can do it,” says Dave. “We have done it so often and in so many different locations that it has become one of our specialties. Most clients know this too and appreciate our flexibility. They only have to give us a signal and we are already on our way. With the right people, machines and tools to any location in the world.”

Stake

  • 40 specialists
24 hours per day
7 days per week
24 hours per day
7 days per week

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
IMG_2794
Efficient and safe dismantling of a power plant in Berlin
DE Demolition
batch_22-11-2021 (18) (1)
Complex dismantling of the arch bridge in Vianen
NL Dismantling
1758951108587
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2)
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens
DARDA C12
BE Demolition
IMG_4944
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug
Demolition of heavy loading bridge Hamburg
DE Demolition