Crude Oil Tank Dismantling at Industrial Refinery

Philippines

Crude Oil Tank Dismantling at Industrial Refinery

The overall scope included the removal of crude oil tanks, LPG spheres, flare installations, other process installations, decommissioned buildings, OM tanks, and material recovery including scrap and metals.

A significant portion of the works consisted of the demolition of three large crude oil storage tanks with floating roofs.

Technical Scope – Crude Oil Tanks
The three crude oil tanks each had the following specifications:

  • Diameter: 73 meters
  • Height: 20 meters
  • Floating roof construction
  • Total combined weight: approximately 4,000 tonnes
  • Execution period: 4 months
  • Main equipment: 2 long-reach excavators with scrap shear attachments

Execution Methodology
The dismantling works were carried out using a fully mechanized demolition approach to maximize safety and efficiency.

  • An access opening was created in the tank wall.
  • The floating roofs were dismantled using excavators equipped with scrap shear attachments.
  • The tank walls were mechanically reduced to approximately 6 meters using long-reach excavators.
  • The lower shell rings, with a wall thickness of 38 mm, were removed by oxy-fuel cutting.
  • Steel plates were carefully cut to size during dismantling to optimize reuse and material recovery.

This method ensured a controlled demolition process with maximum material recovery and minimal manual intervention.

2274ddbb-5471-4a01-8927-b86a0438b90d.jpg

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
873fdee1-3f1a-44ff-9a92-5dafa9f7262f.jpg
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
186dedd4-8eaa-4c00-8d82-bb7f437d5b29.jpg
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
20231106 Foto 10 Spheres.jpg
Controlled dismantling of five gas storage tanks in Batangas
300 (2).jpg
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
Rheinbrucke_Duisburg_Award_Winning_Project_DDM.jpg
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens.jpg
DARDA C12
BE Demolition
IMG_4944.JPG
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition
Afbraak lichtmasten Oostende 2.jpg
Demolition of light poles in Oostende
BE Dismantling Demolition
Leidingwerk Rotterdam 2.jpg
Dismantling pipework in Rotterdam
NL Dismantling
608a4783-4041-4e0d-83b0-3eb73695d296.jpg
Dismantle remove production factory
NL Dismantling
Circulair slopen stripper 2.jpg
Circular demolition of a stripper
NL Demolition