Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines

Philippines

Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines

Controlled demolition of an 80-meter-high flare stack in the Philippines.
Within an active industrial site, DDM carried out the safe and controlled dismantling of a 120-ton flare stack. Thanks to detailed engineering, strict safety measures, and specialized equipment, the structure was successfully brought down within the predetermined drop zone.

The controlled demolition of this 80-meter-high flare stack formed an essential part of a large-scale industrial decommissioning project in the Philippines. With a total weight of approximately 120 tons and its location within an active industrial environment, this project required a well-considered approach, in-depth engineering, and maximum safety control. Thanks to a carefully developed demolition strategy, the flare stack was safely and controllably brought down within the predetermined drop zone.

Prior to execution, a comprehensive technical analysis was carried out, fully mapping the structural characteristics of the flare installation. Based on this analysis, a controlled cutting sequence was designed and the exact fall direction and impact zone were determined. Strict safety perimeters and environmental protection measures were implemented to minimize risks to the surroundings and all involved parties. Weather conditions and environmental factors were continuously monitored to ensure optimal safety throughout the works.

The demolition activities were carried out using specialized equipment, including excavators fitted with scrap shears and sorting grapples, a mobile elevating work platform (MEWP), and certified burners for precision cutting. By systematically weakening the structure at predetermined release points, the flare stack was brought down according to plan and under full control.

Following the controlled fall, the steel structure was further reduced at ground level and processed into manageable sections for transport and recycling. All steel components were carefully separated and prepared for high-quality material recovery. This project highlights DDM’s expertise in complex industrial demolition, controlled dismantling, and sustainable decommissioning within operational industrial environments.

542919b2-59d2-45db-8f63-08c45d32f81f.jpg

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
873fdee1-3f1a-44ff-9a92-5dafa9f7262f.jpg
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
9243276e-beb3-47c2-8208-91c561c71ba8.jpg
Crude Oil Tank Dismantling at Industrial Refinery
20231106 Foto 10 Spheres.jpg
Controlled dismantling of five gas storage tanks in Batangas
300 (2).jpg
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
Rheinbrucke_Duisburg_Award_Winning_Project_DDM.jpg
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens.jpg
DARDA C12
BE Demolition
IMG_4944.JPG
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition
Afbraak lichtmasten Oostende 2.jpg
Demolition of light poles in Oostende
BE Dismantling Demolition
Leidingwerk Rotterdam 2.jpg
Dismantling pipework in Rotterdam
NL Dismantling
608a4783-4041-4e0d-83b0-3eb73695d296.jpg
Dismantle remove production factory
NL Dismantling
Circulair slopen stripper 2.jpg
Circular demolition of a stripper
NL Demolition