In Böhlen, Germany, DDM acquired a complete acrylic factory to use as it saw fit.This acquisition also meant that we were responsible for all the permit and regulation management processes, as well as having obligations vis-à-vis the site operator. This meant that we acted as the main contractor i.e. as the owner of the installation, with all the associated rights and obligations.
A special aspect of this project was the cleaning of the chemical installation. Our service package consisted of a complete industrial cleaning of the acrylic factory, including the emptying of all the systems. Before DDM started the work, we had an independent analysis carried out to establish the types of system contamination present. We then used these results to direct the deployment of special suction cars that subjected the installation to an industrial-scale emptying and clean-up operation.
Following this, a largely in-situ cleaning operation was carried out, with certain components being cleaned inside specially designed washing containments in line with the SIR standard. Following the successful cleaning of the whole system, DDM, which is certified for this work, both certified and documented the nwhole process in line with the AWSV guidelines and then reported the cleaning results to the relevant competent authority.
With DDM, the focus was on protecting and preserving the environment and the natural resources. This is why we re-used many components of the system and made demolished materials ready for re-use. DDM distinguishes itself not only in this regard but also because it continues to make major progress in improving sustainability and efficiency. What’s more, all waste flows were carefully separated and transported to certified processing companies.
The special aspect of this project is the emphasis on safety during each phase of its execution. Despite the complexity and the many challenges, DDM carried out the project carefully and effectively, with safety always being the highest priority. The team ensured that all safety protocols were closely followed, so that the project could be completed successfully and without incident.
The project in Böhlen is impressive evidence of the wide range of services and expertise that DDM can offer. From work preparation through thorough cleaning to implementation and the re-use of materials: DDM handles and controls every stage of the process. Thanks to this integrated approach that focussed on quality and sustainability, the project was a complete success.
The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.
DDM was rewarded with a World Demolition Award in the Civils category.
Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.
Every year DDM holds a number of safety days to boost safety awareness.
Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.
Dow has awarded DDM a certificate for Outstanding Safety Performance.
Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "