Replacing rotary dryers

Replacement of large dryers

Check it!

Rotterdam, Netherlands Dismantling

Replacing rotary dryers

Dismantling and replacing two rotary dryers in the heart of an operational factory in Rotterdam requires detailed preparation. Exactly a job for DDM!

A completely flat work floor was first created outside. The two dryers were removed entirely through the facade, so that the asbestos-containing materials in the outer casing could remain intact. To prevent dust development, the dryers were first hosed down and wrapped in foil before being moved out of the building on rails.

In order to remove the dryers in their entirety, the rotating inner casing had to be attached to the outer casing. A custom frame held the dryers together. Once the frame was assembled, the dryer drivetrain and motors were removed.

The frame with the dryers was jacked up a few millimeters so that the supports under the dryers could be removed. The dryers were then lowered again, placed on the rails and dragged out. There they were jacked up to a height of about 1.5 meters. A Self Propelled Modular Transporter (SPMT) was placed underneath the dryers, which then maneuvered the equipment out of the very tight space between the buildings.

DDM specialists later installed the new dryers using exactly the same method and with the same equipment. The old dryers were removed from the building, loaded on a low loader and transported to the DDM yard in De Meern for removal of the asbestos. The work was completed within budget and one day ahead of schedule.

Stake

  • 8 specialists
  • Forklifts
  • SPMT
  • Low loader
  • Hydraulic cranes 200-300T
03 Cabot-77.JPG
02 Cabot-61.JPG
01 IMG_3477-bewerkt.jpg
_HERO_Cabot-78bewerkt.jpg
2 rotary dryers
17 x 3,9 x 3,3 meter
50 tons per piece
2 rotary dryers
17 x 3,9 x 3,3 meter
50 tons per piece

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
IMG_2794.jpg
Efficient and safe dismantling of a power plant in Berlin
DE Demolition
batch_22-11-2021 (18) (1).JPG
Complex dismantling of the arch bridge in Vianen
NL Dismantling
1758951108587.jpg
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f.jpg
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29.jpg
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8.jpg
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres.jpg
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2).jpg
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM.jpg
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens.jpg
DARDA C12
BE Demolition
IMG_4944.JPG
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition