Dismantling presses Franke Brunssum

Brunssum, Netherlands Demolition Dismantling

Dismantling presses Franke Brunssum

DDM has received the trust of its client Franke to carefully dismantle 7 presses and various structures, containing a total of 550 tons of scrap.

Before the project started, we, in consultation with the client, looked at whether our disassembly specialists could purchase separately, due to the Covid-19 virus. In addition, we have taken control measures so that our dismantling specialists can work protected and undisturbed during the work.

The production hall where the presses were located was very polluted. A lot of work was done with polyester in the production hall; this created a lot of dust, which could be a potential fire hazard. We started with a team that carried out a cleaning action to create a safe working environment.

As soon as the hall was delivered clean, we started the demolition with another team. Using a crawler crane equipped with a scrap shear, we first cut away the surrounding platforms and pipes to free the presses. This was a very precise job because the hall was caved in on all sides. The working area was limited to only the “middle path” which we had well marked in advance. The remaining items were removed using aerial platforms.

We then started dismantling the presses; Cutting torches from aerial work platforms were used. We lifted the remaining parts with a 250 tonne crane and the existing overhead cranes. In this way we removed the presses to the basement. As soon as a hole appeared in the floor from the ground floor to the basement, we immediately closed it off with crush barriers so that there was no risk of falling. Subsequently, all other items were dismantled in the cellars, as well as the remaining buildings on the site.

The customer was so satisfied with the work carried out by DDM that we were commissioned additional work during the project.

The project was delivered within budget, without incidents and on time, which was translated by the customer into a very positive delivery report.

Stake

  • Demolition excavator
  • Aerial platforms
  • Cutting torches
  • Panther burner
  • Disassembly specialists
  • 250t Crane

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
1758951108587.jpg
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f.jpg
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29.jpg
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8.jpg
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres.jpg
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2).jpg
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM.jpg
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens.jpg
DARDA C12
BE Demolition
IMG_4944.JPG
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition
Afbraak lichtmasten Oostende 2.jpg
Demolition of light poles in Oostende
BE Dismantling Demolition
Leidingwerk Rotterdam 2.jpg
Dismantling pipework in Rotterdam
NL Dismantling