Afbeelding artikel trams GVB.JPG

Dismantling 11G/12G trams GVB

Utrecht, Netherlands Demolition Dismantling

Dismantling 11G/12G trams GVB

The Amsterdam city transport GVB has said goodbye to the 11G/12G trams after 32 years. GVB is preparing to purchase the 15G series trams, which will be used from 2021 to replace the old 11G/12G vehicles.

DDM has been asked to charge the old stream of 11G/12G trams in combination with van der Vlist and transport them in their entirety to DDM's specially equipped location in De Meern, and ultimately dismantle and recycle them independently.

DDM started dismantling the trams on July 5, 2021. The total weight of a decommissioned tram is considerable and is therefore not an everyday job... A team of disassembly specialists have prepared our work area to receive the trams. Special facilities have been installed to enable the trams to be unloaded from the low loader without the use of hoisting and lifting equipment. Before the demolition of the trams could begin, the foreman checked whether there was any damage or defects on the trams that could pose a danger to people and the environment. Working safely is always a top priority at DDM.

DDM has done everything it can to dismantle the 11G/12G vehicles within the set frameworks. The trams were mechanically demolished by DDM using a demolition crane equipped with a scissor, demolition and sorting grab. In addition, several parts have been manually dismantled by our disassembly specialists. The various waste flows from the trams are processed separately. In this way, the project was completed without any disasters in a sustainable manner.

The GVB is very satisfied with DDM as a cooperation partner. The project was completed without incident and within the specified time. DDM can look back with pride on another successful project.

Afbeelding artikel trams GVB- 2.jpg
4 months
4 months

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
1758951108587.jpg
Large-scale industrial dismantling in Hamburg
DE Dismantling
873fdee1-3f1a-44ff-9a92-5dafa9f7262f.jpg
Dismantling of 55-Ton Heavy Filter Presses in Wesseling | Sustainable Industrial Decommissioning
DE Dismantling
186dedd4-8eaa-4c00-8d82-bb7f437d5b29.jpg
Controlled Demolition of an 80-Meter-High Flare Stack | Industrial Decommissioning Project in the Philippines
PH Demolition
9243276e-beb3-47c2-8208-91c561c71ba8.jpg
Crude Oil Tank Dismantling at Industrial Refinery
PH Dismantling
20231106 Foto 10 Spheres.jpg
Controlled dismantling of five gas storage tanks in Batangas
PH Dismantling
300 (2).jpg
COMPLETE SOLUTION FROM DDM: FROM CLEANING TO THE SUSTAINABLE RE-USE OF AN ACRYLIC FACTORY IN BÖHLEN
DE
Rheinbrucke_Duisburg_Award_Winning_Project_DDM.jpg
Demolition of the Rheinbrücke Neuenkamp, Duisburg
DE Demolition
Darda 3 mens.jpg
DARDA C12
BE Demolition
IMG_4944.JPG
Complete dismantling of a body shop installation for a major car manufacturer
NL Relocation Dismantling
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition
Afbraak lichtmasten Oostende 2.jpg
Demolition of light poles in Oostende
BE Dismantling Demolition
Leidingwerk Rotterdam 2.jpg
Dismantling pipework in Rotterdam
NL Dismantling