Demolition of two cooling tower cells

Schwedt, Germany Demolition

Demolition of two cooling tower cells

A large refinery in eastern Germany has asked us to remove 2 cooling tower cells.

We have started demolishing the concrete structure, up to the top of the cooling basin. First of all, we placed approximately 1500m³ of filling floor in the basin to protect the foundation and the supports underneath. These are partly reused for the construction of two new cooling tower cells.

The next step was to dismantle the facade panels and the drip beams from the concrete construction of the cells. We started dismantling it using a 45T crawler crane with a long arm, which was completed as planned within two weeks. After the demolition of the concrete structures and the removal of the resulting materials, we removed the filling floor from the basin.

We removed the remaining foundation piles that are no longer needed for the new construction with concrete saws. This last job also went on time and according to plan. We completed the entire project within 8 weeks.

The customer is very satisfied because the work was carried out and delivered on site on time, safely and without inconvenience.

Schwedt1.JPG
12 disassembly specialists
8 weeks
12 disassembly specialists
8 weeks

SAFETY FIRST ALWAYS!

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.

Read more

Scherm­afbeelding 2024-01-19 om 14.03.31.png

WORLD DEMOLITION AWARDS

DDM was rewarded with a World Demolition Award in the Civils category.

Removing 5 arch bridges over the Amsterdam Rhine Canal was an intensive job. The schedule was tight and the expectations of all employees were high. But with a joint effort and incredible passion, DDM has successfully removed and recycled the 5 bridges within schedule.

DDM SAFETY DAYS

Every year DDM holds a number of safety days to boost safety awareness.

Last year's objectives are evaluated and new objectives are determined. All managers and all operational employees discuss safety, policy and vision together. In addition to all regular training courses, DDM offers workshops and training to all employees during these days to take the qualities of the professionals to an even higher level. Together with all DDM employees, we are working on an increasingly higher safety ethic. Everyone at DDM carries out their work in a safe and healthy manner, with sufficient attention to the environment. And they're getting better at it. This applies to everyone; back to work healthy and safe and back home healthy.

DOW SAFETY RECOGNITION

Dow has awarded DDM a certificate for Outstanding Safety Performance.

Following various demolition and disassembly projects that DDM carries out worldwide for Dow Chemical Company, DDM has received recognition for its excellent safety performance during implementation. DDM always continues to strive for a higher level of safety. Safety First! Read below a quote from the letter that DDM received from Dow. “In summary, DDM continues to deliver excellent performance in safely planning and executing all work related to Dow demolition projects. We truly believe that your company's exceptional efforts continue to be a reflection of the leadership and support of you and the entire DDM Management team. "

Other projects

SCROLL
Slopen zware laadbrug.jpg
Demolition of heavy loading bridge Hamburg
DE Demolition
Afbraak lichtmasten Oostende 2.jpg
Demolition of light poles in Oostende
BE Dismantling Demolition
Leidingwerk Rotterdam 2.jpg
Dismantling pipework in Rotterdam
NL Dismantling
608a4783-4041-4e0d-83b0-3eb73695d296.jpg
Dismantle remove production factory
NL Dismantling
Circulair slopen stripper 2.jpg
Circular demolition of a stripper
NL Demolition
IMG_2631.JPG
Breaking down ethylene plant
BE Demolition Asbestos
IMG_8022.JPG
Dismantling pipelines
DE Dismantling Demolition
IMG_3280.JPEG
Dismantling Nelson Mandela Bridge
NL Dismantling
IMG_2471-2.JPG
Dismantling industrial hall
BE Dismantling
IMG_6282 - 4.jpg
Decomposition of paraformaldehyde plant
BE Dismantling Demolition
Artikel Hellenic Griekenland.jpg
Turnaround Greece
GR Dismantling
647e546a-c6da-4ec4-ad2d-f3be9458f8cd.JPG
Removal of floating tank roof in Wesseling
DE Dismantling