Within a live refinery in Rotterdam, we removed 400 meters of 10-inch pipe using cold-cutting techniques. A complex job: the pipe was in the middle of the pipe bridge and access was restricted. The adjacent pipes were all live and continued to transfer product across the site. Due to the tight nature of the pipe bridge, access to cut and remove sections of pipework was challenging and required careful planning.
A comprehensive project safety plan and risk analysis was developed prior to the work commencing. Once all safety briefings were given and permits were received, we undertook all necessary measurements of the pipework to develop the cutting sequence. We then drilled holes at pre-determined intervals to measure atmospheric conditions and check for residual products within the pipes
Once all safety checks were completed, we started to cut the pipework using compressed air saws. Attaching the saws to the pipework using chains to hold them in place, ensured that hand arm vibration was kept to an absolute minimum throughout the project. During the cutting phase, it was imperative that the cutting blades were cooled to maximise cutting performance. Working from scaffold access platforms, DDM operatives used chain hoists and beam clamps to lower the pipes to the scaffold work platform in a controlled manner
Once the pipes were stockpiled in the designated area, a mobile crane was used to lift all pipe sections on to the back of a trailer and transported away from the site for recycling. This process continued until the remainder of the 16-inch pipe was removed.
The client was very satisfied with the end result and in particular the way in which DDM dealt with the project specific challenges, client safety concerns and workmanship required in this project.
DISMANTLING
Location
Rotterdam
Deployment
- - 2 specialists
Size
Project duration
10 weeks
Safety First! Always.
PROJECT LOCATION
demontage Projects
-
Dismantling of O2 degassers
Limburg, Netherlands
-
Complex asbestos project
Limburg, Netherlands
-
PVC and VCM plant
Terengganu, Malaysia
-
Demolition of production lines
Belgium
-
disassemble presses
Limburg, Netherlands
-
Dismantling 11G/12G trams GVB
Utrecht, Nederland
-
Dismantling a factory
Overijssel, Nederland
Baden-Württemberg, Duitsland
-
Dismantling and removing various parts from a production plant
Noord-Holland, Nederland
-
Dismantling Nelson Mandelabrug
Zuid-Holland, Nederland
-
Dismantling of an industrial hall in Olen, Belgium
Vlaams Gewest, België
-
Dismantling lighting poles
Vlaams Gewest, België
-
Dismantling plant
Opper-Oostenrijk, Oostenrijk
-
Dismantling of paraformaldehyde plant
Flanders, Belgium
-
Dismantling of Pipework
South Holland, Netherlands
-
Dismantling production lines
Limburg, Netherlands
-
Truck cab production line
Vlaanderen, België
-
Replacing rotating dryers
Zuid-Holland, Nederland
-
Compounding unit
Pahang, Maleisië
-
Power plant in Amsterdam
Noord-Holland, Nederland
-
Removal of floating tank roof
North Rhine-Westphalia, Germany
-
Removal of water tanks
Utrecht, Netherlands
-
Turn around, shutdown in Greece
Athens, Greece
-
Turnaround Greece
Eleusis, Greece