Disassemble a complete factory and transport it to Germany

"250 TONS OF EQUIPMENT DISMANTLED"

Dismantling a complete factory and transporting it to Germany

DISMANTLING Projects | Dismantling a factory

RELOCATION Projects | Dismantling a factory

DDM was responsible for dismantling an additives plant in Deventer.

This factory used a chemical agent that increased the lifespan of car tyres. To safely dismae the production line, the installation had to be thoroughly cleaned first. The piping was then removed to make room for dismantling the reactor vessels and heat exchangers.

Due to the restricted space DDM used hoists and sets of rollers to move the equipment from its place. After that the components were hoisted out of the building using a hydraulic crane. Final cleaning of the equipment was done in a spraying area set up specially for this purpose. A final inspection was then performed by the German TÜV.

DISMANTLING

RELOCATION

Locations

Deventer, Netherlands & Mannheim, Germany

Deployment

  • - 10 dismantling specialists
  • - Forklift trucks
  • - Hydraulic lifting cranes
  • - Low-loader transport trailers

Size

250 tonnes of dismantling equipment

Project duration

3 months

RELOCATION

DISMANTLING

TAGGING AND MARKING

TRANSPORT

Safety First! Always.

The Quality and Health, Safety and the Environment policy is an ongoing process. That is why DDM is continuously working on improving all these areas to keep improving safety levels.
Find out more

PROJECT LOCATION

Services Latest DDM