At the Chemelot site in Geleen we removed two O2 degassers. Safety and the care of the adjacent live tanks and pipelines were the challenges in this project. Otherwise, the entire site could cease production.
Through good work preparation and excellent consultation with the client, we arrived at a working method that was workable for all parties. The work area was restricted, which is why we took extra measures so that the project could be carried out safely. All this was planned in detail in the project plan with a complete risk inventory and evaluation.
We started with the removal of the stair tower and the platforms, which we removed from an aerial platform and subsequently lifting down to ground level. We then cut the degassers, lifted them in large sections and placed them directly on to transport. The pieces were transported to our scrapyard on the Chemelot site, where they were further reduced in size using excavators fitted with hydraulic shears before being transported to an authorized scrap processor.
We then removed all the pumps and remaining piping in the hall using the overhead crane. Structural work was also carried out, the pump foundations were finished and the outer wall was repaired with new cladding.
The team was ready on time, within budget and without a single incident. The client was very pleased with the working method and deployment of DDM.
DEMOLITION
DISMANTLING
Location
Geleen. Netherlands
Deployment
- - Demoliton excavator
- - Arialplatform
- - Cutting torches
- - Crane
- - Dismantling specialists
Project duration
3 weeks
Safety First! Always.
PROJECT LOCATION
sloop Projects
-
Storage tanks
Zuid-Holland, Nederland
-
Caution as the keyword
Nordrhein-Westfalen, Duitsland
-
Dismantling of O2 degassers
Limburg, Netherlands
-
Demolition of a stripper
Limburg, Netherlands
-
Clearing out of factory hall
Waals Gewest, België
-
Controlled explosion
Sachsen, Duitsland
-
Styrene factory
Zeeland, Nederland
-
PVC and VCM plant
Terengganu, Malaysia
-
Demolition heavy loading bridge
Hamburg, Germany
-
Demolition of Ethylene Plant
Flanders, Belgium
-
Demolition of Factory
Zeeland, Netherlands
-
Demolition of production lines
Belgium
-
Demolition of two cooling tower cells
Brandenburg, Germany
-
disassemble presses
Limburg, Netherlands
-
Dismantling 11G/12G trams GVB
Utrecht, Nederland
-
Dismantling lighting poles
Vlaams Gewest, België
-
Dismantling plant
Opper-Oostenrijk, Oostenrijk
-
Dismantling of paraformaldehyde plant
Flanders, Belgium
-
Dismantling production lines
Limburg, Netherlands
-
Expert demolition of furnaces
Ústecký kraj, Tsjechië
-
Oil platform in the Baltic Sea
Oostzee
-
Power station demolition
England, United Kingdom
-
Power plant in Amsterdam
Noord-Holland, Nederland
-
Removal of 'milkmaids'
Zeeland, Netherlands
-
Removal of 5 bridges
Noord-Holland, Nederland
-
Removal of steel mill
North Rhine-Westphalia, Germany
-
Site clearance after tragic explosion
Suez Governorate, Egypt
-
Removal of a huge storage hall
Hamburg, Duitsland
-
Working at the biggest refinerie
South Holland, Netherlands